Ready-Mix Concrete Prices in Kenya, by Class and Per Cubic Metre

What ready-mix costs per cubic metre

Rates below are for concrete delivered to a Nairobi site, reviewed August 2026, and exclude pumping and placing.

Supply-only against placed: two different numbers

This is where most confusion about Kenyan concrete pricing comes from, and it is worth being precise.

Two independent published sources were compared for this page. A supplier’s own ready-mix rates give Class 15 at 9,490, Class 20 at 11,470, Class 25 at 13,480 and Class 30 at 15,200 per cubic metre. Contractor rates derived from Kenya National Bureau of Statistics figures, VAT included, give 9,500, 11,900, 14,500 and 19,200 for the same classes.

They agree closely at the low grades and diverge sharply at Class 30. That is not a contradiction. Contractor rates include placing, labour, formwork and compaction, and the gap widens with cement content because richer mixes are more work to place and compact properly.

So: use the first table when you are buying concrete and placing it yourself. Use the second when somebody is quoting to supply and place. Comparing one against the other, in either direction, will mislead you by up to a quarter.

What moves your price

Class. The largest single factor, and it is set by your engineer rather than by preference.

Volume. Full loads are cheaper per cubic metre than part loads, and below the minimum there is a surcharge for the drum.

Distance. From the plant to your site, at the actual time of day the pour is scheduled.

Pumping. From about 700 per cubic metre on top, if the truck cannot reach the pour or the pour is above ground floor.

Waiting time. Free for a defined discharge window, charged after it. This is within your control and it is the cost most often incurred unnecessarily.

Getting a comparable quotation

Ask every supplier for four things: the class, whether the rate is delivered, the minimum load and the part-load surcharge, and the free discharge time. Quotes that look different frequently are not, and quotes that look identical sometimes differ by a great deal on the fourth question.

Rates

Work Rate Notes
Class 15 KES 9,500 - 10,500 /m³ Blinding, mass fill, pathways. Not for anything structural
Class 20 KES 11,500 - 13,000 /m³ Residential ground slabs, light foundations
Class 25 KES 13,500 - 16,000 /m³ Suspended slabs, columns, beams. The usual residential structural grade
Class 30 KES 15,200 - 19,000 /m³ Heavy foundations, transfer beams, water-retaining work
Pumping from KES 700 /m³ Added to the supply rate. Booked with the pour, not on the day
Part load surcharged Below the minimum load you pay for the drum, not the concrete. Ask for the figure

Rates reviewed August 2026. Every job is confirmed with a written quotation before work starts.

What a concrete supply rate does not include

Every one of these sits under the surface, which is exactly why cheap quotes omit them. They are itemised here rather than discovered once the blocks are already down.

  • Pumping. Quoted per m³ on top of supply, and booked with the pour rather than requested on the day
  • Placing, compaction and finishing. The rate buys concrete in the drum, not concrete in the formwork
  • Formwork, reinforcement and their fixing
  • Waiting time beyond the free discharge window. A truck held on site is a truck not doing its next pour
  • Part-load surcharges below the minimum order
  • Access works. If a loaded truck cannot reach the pour, the answer is a pump, and that is priced
  • County levies and any road-use permit where a plant vehicle needs one

Worked examples

Work Rate Notes
Class 15 placed KES 9,500 /m³
Class 20 placed KES 11,900 /m³
Class 25 placed KES 14,500 /m³
Class 30 placed KES 19,200 /m³ Against 15,200 supply-only: the gap is labour, formwork and vibration

Rates reviewed August 2026. Every job is confirmed with a written quotation before work starts.

Frequently asked questions

Is that price delivered?
Yes, within the standard radius. Beyond it, transport is added and we state it before you book rather than after you have poured. Difficult access can also change the method from truck to pump, and that is a separate line rather than a surprise.
Why is Class 30 so much more than Class 20?
Cement. Strength class is essentially bought with cement content, and cement is the expensive constituent. Between Class 20 and Class 30 you are adding a substantial amount of it per cubic metre, which is most of the difference between roughly 11,500 and roughly 15,200.
What is the difference between the two tables?
The first is concrete delivered to your site in the drum. The second is what published contractor rates show for the same concrete placed, which includes labour, formwork and compaction. At Class 30 the gap is about 4,000 shillings a cubic metre, and that gap is the work rather than the material.
What happens if I order too little?
You get a cold joint, which is a permanent weakness through the slab. It is the reason we calculate from drawings and add a realistic allowance. A small overage costs a few thousand shillings; a cold joint through a structural slab cannot be fixed afterwards.
Is there a minimum load?
Yes, and below it you pay for the drum rather than the concrete. For genuinely small pours a volumetric truck that mixes on site is usually the cheaper answer, and we will say so rather than sell you a surcharged part load.

Send us the area

The class, the cubic metres, the date and a photo of your gate. We will come back with a rate and a slot, and tell you plainly if the truck cannot reach the pour.

Sub-base compacted in layers · edge restraint haunched · falls set at survey, not by eye

Call us WhatsApp a quote